Loading...
Case Studies 2020-10-02T11:35:15+00:00

Tooting Hospital

Our client was employed to re-tube a boiler at Tooting Hospital, which had oxygen corrosion.
Due to the importance of this unit…

Refinery Shutdown Singapore

Our client was preparing for a refinery shutdown in Singapore and required 2 sets of 1020 ‘U’ tubes. Specifically…

Chile in 2 Days

A sulphuric acid produce in Chile had a breakdown requiring 316L. Salem supplied 3200 lengths (19.05mm x 2.11mm) in two days…